{"id":8311,"date":"2015-09-24T11:43:28","date_gmt":"2015-09-24T15:43:28","guid":{"rendered":"http:\/\/www.bwsailing.com\/?p=8311"},"modified":"2015-09-24T11:43:28","modified_gmt":"2015-09-24T15:43:28","slug":"heading-back-to-sea","status":"publish","type":"post","link":"https:\/\/www.bwsailing.com\/bw\/heading-back-to-sea\/","title":{"rendered":"Heading Back to Sea"},"content":{"rendered":"<p><em>It&#8217;s a familiar theme, but as with all long distance passages, there are-and will be-vast differences.\u00a0 (published August 2015)<\/em><\/p>\n<p>It\u2019s early June and another transatlantic passage is about to unfold, this one aboard <em>Moondance<\/em>, a beautifully maintained Swan 56. For me, it\u2019s my 40th transat; for the seven others on the crew, it\u2019s their first. Those details, however, can be hugely misleading and largely insignificant when compared to the myriad other details that have been and will be addressed prior to and throughout the passage. Each member of the team is accomplished in a wide variety of endeavors, and most have previously sailed offshore. As with any passage, before anyone is able to enjoy the offshore sunsets from the cockpit, there are numerous pre-departure details to address. Preparation can be a daunting task especially if you\u2019re not familiar with the process, and regardless of how much experience one has, it should never be shortchanged.<\/p>\n<p>Long ago, I heard it said that the sea will find any weakness. I\u2019ve also heard it said that if I stay in sailing long enough and cover enough miles, everything that can go wrong, will go wrong. Good preparation is an effort to disprove that last statement. Well-orchestrated preparation is no less a thing of beauty than a properly equipped and managed vessel at sea. The preparation is, in fact, the rebirth of that potential, and Michael, the owner, has done a magnificent job of orchestrating that rebirth.<\/p>\n<figure id=\"attachment_8313\" aria-describedby=\"caption-attachment-8313\" style=\"width: 432px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.bwsailing.com\/wp-content\/uploads\/2015\/09\/IMG_8723.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-8313\" src=\"http:\/\/www.bwsailing.com\/wp-content\/uploads\/2015\/09\/IMG_8723.jpg\" alt=\"It all looks a little bit crazy in the beginning\" width=\"432\" height=\"288\" srcset=\"https:\/\/www.bwsailing.com\/bw\/wp-content\/uploads\/2015\/09\/IMG_8723.jpg 432w, https:\/\/www.bwsailing.com\/bw\/wp-content\/uploads\/2015\/09\/IMG_8723-300x200.jpg 300w, https:\/\/www.bwsailing.com\/bw\/wp-content\/uploads\/2015\/09\/IMG_8723-192x128.jpg 192w\" sizes=\"auto, (max-width: 432px) 100vw, 432px\" \/><\/a><figcaption id=\"caption-attachment-8313\" class=\"wp-caption-text\">It all looks a little bit crazy in the beginning<\/figcaption><\/figure>\n<p>DELEGATING TASKS<br \/>\nThe conception of that rebirth begins with the creation of\u00a0 job lists. The more complete and well organized those lists, the more complete and well-organized the preparation can be. As one prepares a boat, the first task is to formulate the \u201cideal\u201d and most complete list of tasks that one would like to accomplish on the vessel prior to her first use. Later, additional tasks may occur to someone, but if the job list is kept on file in a computer, the list can be easily modified, and the most complete version can be saved for future reference. The list should not only be a listing of tasks or tools, but it should also have space reserved for noting who is responsible for the completion of the task and a space for noting the date on which that task has been completed.<\/p>\n<p>Aboard <em>Moondance<\/em>, Michael and his captain, Charles as well as Andy the yard manager and I exchanged lists to make sure that all details were addressed months in advance of our intended departure date. Time was a luxury that we had, thanks in large measure to early decisions and adequate lead time to accomplish the many tasks. Rudder bearings were inspected and replaced during the winter. Safety equipment was checked out, and individuals were assigned areas of responsibility so individual preparation could begin early, as well.<\/p>\n<p>To make it easier to formulate the list as well as delegate various areas of responsibility, the general master work list can be broken down into specific areas. These areas should include: \u201cNavigation\u201d, \u201cElectrical\u201d, \u201cMechanical\u201d, \u201cStructural\u201d, \u201cRigging\u201d, \u201cSails\u201d, \u201cWinches\/Deck Hardware\u201d, \u201cSafety\u201d, \u201cProvisions\u201d, \u201cMiscellaneous\u201d, and \u201cTool Inventory\u201d. Naturally, different vessels will have different requirements. Powerboat owners wouldn\u2019t have much use for a job list that included sail repairs, but they might feel the need to break down the \u201cMechanical\u201d list into smaller categories that included \u201cRefrigeration\u201d, \u201cMain Engine\u201d, \u201cGenerator\u201d, etc. Similarly, some racing boat owners might want to break down the Tool Inventory list into: \u201cTools Onboard During Races\u201d, \u201cTools Onboard For Casual Cruising and General Maintenance\u201d, and \u201cTools In The Container\/Van\u201d.<\/p>\n<figure id=\"attachment_8314\" aria-describedby=\"caption-attachment-8314\" style=\"width: 377px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.bwsailing.com\/wp-content\/uploads\/2015\/09\/Chart-reading.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-8314\" src=\"http:\/\/www.bwsailing.com\/wp-content\/uploads\/2015\/09\/Chart-reading.jpg\" alt=\"Pre-planning\" width=\"377\" height=\"244\" srcset=\"https:\/\/www.bwsailing.com\/bw\/wp-content\/uploads\/2015\/09\/Chart-reading.jpg 414w, https:\/\/www.bwsailing.com\/bw\/wp-content\/uploads\/2015\/09\/Chart-reading-300x194.jpg 300w, https:\/\/www.bwsailing.com\/bw\/wp-content\/uploads\/2015\/09\/Chart-reading-230x150.jpg 230w\" sizes=\"auto, (max-width: 377px) 100vw, 377px\" \/><\/a><figcaption id=\"caption-attachment-8314\" class=\"wp-caption-text\">Pre-planning<\/figcaption><\/figure>\n<p>The initial list should be as detailed as possible. By making a detailed list, it will be easier to determine whether something has been accomplished, and fewer tasks will be over-looked. By creating and keeping a \u201cmaster list\u201d that includes most of the jobs you would ever want to do, next year\u2019s tasks of decommissioning and recommissioning will be greatly simplified. As new jobs occur to you, add them to the master. A great help has been to go through the list with the crew and get their aid in creating the original list as well as executing many of the necessary tasks. Determine who is responsible for the completion of a particular task or area of tasks and get their estimate of a completion date.<\/p>\n<p>While having a very complete list of tasks, tools and repair kits is a good start, you will need to prioritize which items fit into one of several categories. Which things do you \u201cNeed To Do\/Have\u201d, \u201cWould Like to Do\/Have\u201d, \u201cCan Easily be Deferred\u201d. You may want to add an extra 50 feet of chain to the 200 feet you already have, but if you\u2019re cruising in shallow water this year, you may be able to defer that to a later date. Similarly, having all of the tools to complete all of the tasks that you\u2019re likely to encounter can be convenient, but if you\u2019re sailing short distances between well-serviced ports, you may be able to reduce your tool inventory and use your resources elsewhere.<\/p>\n<p>Some jobs may be best left to the yard to perform. Someone on the crew may not be equipped to perform a major engine overhaul or replacement, as an example. The owner or skipper should go through the work list, determine which jobs are to be done \u201cin-house\u201d by the crew, which are to be done by the yard, and which are to be performed by outside contractors. The cost for each job is estimated, and, following consideration by the owner, priorities are established and the list is confirmed. After deciding on the final work list, the work can be appropriately delegated and begun in a suitable schedule.<\/p>\n<p>Any owner will only want to deal with a reputable yard, performing their tasks in a businesslike manner. And, as such, the yard is expected to make a reasonable profit on the work they undertake. But it\u2019s up to the owner or his representative to make informed comparisons prior to making a commitment to commence the work. The relationship between the vessel\u2019s owner and the yard need not and should not be confrontational; both have the same goal of improving the vessel throughout its preparation. But a clear understanding of duties and obligations by both parties put in writing prior to starting work\u00a0 will go a long way in avoiding misunderstandings that are in no one\u2019s best interests. It should also be understood that changes in the list of jobs to be performed by the yard will most probably also imply a change to the charges. Aboard <em>Moondance<\/em> we were fortunate to deal with Jamestown Boat Yard, qualified and experienced with numerous Swans. Andy, their yard manager has overseen construction and a vast number of refits, and he is friendly and trusted by all involved.<\/p>\n<figure id=\"attachment_8315\" aria-describedby=\"caption-attachment-8315\" style=\"width: 360px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.bwsailing.com\/wp-content\/uploads\/2015\/09\/IMG_8708.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-8315\" src=\"http:\/\/www.bwsailing.com\/wp-content\/uploads\/2015\/09\/IMG_8708.jpg\" alt=\"Organizing the deck\" width=\"360\" height=\"240\" srcset=\"https:\/\/www.bwsailing.com\/bw\/wp-content\/uploads\/2015\/09\/IMG_8708.jpg 360w, https:\/\/www.bwsailing.com\/bw\/wp-content\/uploads\/2015\/09\/IMG_8708-300x200.jpg 300w, https:\/\/www.bwsailing.com\/bw\/wp-content\/uploads\/2015\/09\/IMG_8708-192x128.jpg 192w\" sizes=\"auto, (max-width: 360px) 100vw, 360px\" \/><\/a><figcaption id=\"caption-attachment-8315\" class=\"wp-caption-text\">Organizing the deck<\/figcaption><\/figure>\n<p>Whether the jobs are to be performed by members of the crew, the yard or outside contractors, proper scheduling and adequate lead time needs to be allocated for ordering parts and completing pivotal jobs. If it\u2019s desired to have your boat ready by mid-May and someone begins to check out the prop after the first week in May to see if it needs to be replaced or reconditioned, discovering a problem could easily throw the schedule back several weeks.<br \/>\n<a href=\"http:\/\/www.bwsailing.com\/wp-content\/uploads\/2015\/09\/IMG_8773.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-8316\" src=\"http:\/\/www.bwsailing.com\/wp-content\/uploads\/2015\/09\/IMG_8773.jpg\" alt=\"IMG_8773\" width=\"360\" height=\"240\" srcset=\"https:\/\/www.bwsailing.com\/bw\/wp-content\/uploads\/2015\/09\/IMG_8773.jpg 360w, https:\/\/www.bwsailing.com\/bw\/wp-content\/uploads\/2015\/09\/IMG_8773-300x200.jpg 300w, https:\/\/www.bwsailing.com\/bw\/wp-content\/uploads\/2015\/09\/IMG_8773-192x128.jpg 192w\" sizes=\"auto, (max-width: 360px) 100vw, 360px\" \/><\/a><br \/>\nWell-organized and executed preparation is a thing of beauty: A choreography of people and tasks. At the end of it the boat is the winner, and the people involved can be justly proud. Within a few days the crew will soon be ready to enjoy this summer\u2019s mid-Atlantic sunsets, and we will be prepared to safely face the inevitable rough days onboard <em>Moondance<\/em>. Hopefully the fruits of our preparations with be that the sea finds no weaknesses. We\u2019ll know more next month.<\/p>\n<figure id=\"attachment_8317\" aria-describedby=\"caption-attachment-8317\" style=\"width: 360px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.bwsailing.com\/wp-content\/uploads\/2015\/09\/IMG_8834.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-8317\" src=\"http:\/\/www.bwsailing.com\/wp-content\/uploads\/2015\/09\/IMG_8834.jpg\" alt=\"Transatlantic start, Moondance off Castle Hill, Narragannsett Bay, RI\" width=\"360\" height=\"255\" srcset=\"https:\/\/www.bwsailing.com\/bw\/wp-content\/uploads\/2015\/09\/IMG_8834.jpg 360w, https:\/\/www.bwsailing.com\/bw\/wp-content\/uploads\/2015\/09\/IMG_8834-300x213.jpg 300w, https:\/\/www.bwsailing.com\/bw\/wp-content\/uploads\/2015\/09\/IMG_8834-100x70.jpg 100w\" sizes=\"auto, (max-width: 360px) 100vw, 360px\" \/><\/a><figcaption id=\"caption-attachment-8317\" class=\"wp-caption-text\">Transatlantic start, <em>Moondance<\/em> off Castle Hill, Narragannsett Bay, RI<\/figcaption><\/figure>\n<p><em>Bill Biewenga is a navigator, delivery skipper and weather router. His websites are <a href=\"http:\/\/www.weather4sailors.com\">www.weather4sailors.com<\/a> and <a href=\"http:\/\/www.WxAdvantage.com\">www.WxAdvantage.com<\/a>. He can be contacted at <a href=\"mailto:billbiewenga@cox.net\">billbiewenga@cox.net<\/a><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>It&#8217;s a familiar theme, but as with all long distance passages, there are-and will be-vast differences.\u00a0 (published August 2015) It\u2019s early June and another transatlantic passage [&hellip;]<\/p>\n","protected":false},"author":48,"featured_media":8312,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8,16],"tags":[24,116,30,26],"class_list":["post-8311","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cruising-news","category-seamanship","tag-bill-biewenga","tag-bluewater-cruising","tag-passagemaking","tag-seamanship-2"],"_links":{"self":[{"href":"https:\/\/www.bwsailing.com\/bw\/wp-json\/wp\/v2\/posts\/8311","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bwsailing.com\/bw\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bwsailing.com\/bw\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bwsailing.com\/bw\/wp-json\/wp\/v2\/users\/48"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bwsailing.com\/bw\/wp-json\/wp\/v2\/comments?post=8311"}],"version-history":[{"count":1,"href":"https:\/\/www.bwsailing.com\/bw\/wp-json\/wp\/v2\/posts\/8311\/revisions"}],"predecessor-version":[{"id":8318,"href":"https:\/\/www.bwsailing.com\/bw\/wp-json\/wp\/v2\/posts\/8311\/revisions\/8318"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bwsailing.com\/bw\/wp-json\/wp\/v2\/media\/8312"}],"wp:attachment":[{"href":"https:\/\/www.bwsailing.com\/bw\/wp-json\/wp\/v2\/media?parent=8311"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bwsailing.com\/bw\/wp-json\/wp\/v2\/categories?post=8311"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bwsailing.com\/bw\/wp-json\/wp\/v2\/tags?post=8311"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}